Table 39: All active projects managed by ARENA in 2018-19
Proponent name |
Project status |
Project name |
Financial assistance committed (ex GST) |
Financial assistance paid 2018-19 (ex GST) |
Location (State) |
Investment priority |
Primary technology |
Innovation stage |
---|---|---|---|---|---|---|---|---|
Adelaide University |
Active |
Establishing the Australian Energy Storage Knowledge Bank |
$1,441,811 |
$127,192 |
SA |
Other |
Enabling |
Other Study |
Adelaide University |
Active |
Participation in Mission Innovation - Converting Sunlight Innovation Challenge |
$494,000 |
$321,450 |
SA |
Exporting renewable energy |
Solar Thermal |
Other Study |
Adelaide University |
Active |
Integrating Concentrating Solar Thermal Energy into the Bayer Alumina Process |
$4,490,752 |
$1,453,790 |
SA |
Delivering secure and reliable electricity |
Solar Thermal |
R&D |
Advisian Pty Ltd |
Active |
Wind and Solar Forecasting for the NEM Project |
$499,723 |
$0 |
QLD |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Aeolius Wind Systems Pty Ltd |
Active |
Wind Forecasting Demonstration Project |
$1,899,000 |
$0 |
VIC |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
AGL Energy Ltd |
Active |
AGL Energy Application for Demand Response in NSW |
$2,624,019 |
$586,491 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
AGL Energy Ltd |
Active |
5MW Virtual Power Plant in South Australia (VPP-SA) Project |
$5,000,000 |
$1,000,000 |
SA |
Delivering secure and reliable electricity |
Enabling |
Deployment |
AGL PV Solar Holdings Pty Limited |
Active |
AGL Solar PV project |
$166,700,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Allen Taylor and Co |
Active |
Hardwood Residue Bio-refinery Feasibility Study |
$500,000 |
$285,000 |
NSW |
Improving energy productivity |
Bioenergy |
Other Study |
ANU |
Active |
ANU - Community Models for Deploying and Operating Distributed Energy Resources Study |
$498,650 |
$149,595 |
ACT |
Delivering secure and reliable electricity |
DER Integration |
Other Study |
ANU |
Active |
CONSORT: Consumer Energy Systems Providing Cost-Effective Grid Support |
$2,895,951 |
$823,501 |
TAS |
Delivering secure and reliable electricity |
Enabling |
R&D |
ANU |
Active |
Monolithic perovskite – silicon Tandem Cells: Towards Commercial Reality |
$672,841 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Active |
Development of Stable Electrodes for Perovskite Solar Cells |
$936,732 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Active |
Tandem PV Micro Concentrator |
$788,515 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Active |
High-temperature solar thermal energy storage via manganese-oxide based redox cycling |
$1,193,534 |
$440,991 |
ACT |
Delivering secure and reliable electricity |
Solar Thermal |
R&D |
ANU |
Active |
Bladed Receivers with Active Airflow Control |
$1,408,327 |
$0 |
ACT |
Delivering secure and reliable electricity |
Solar Thermal |
R&D |
ANU |
Active |
Hydrogen Generation by Electro-Catalytic Systems R&D Project |
$615,682 |
$307,841 |
ACT |
Other |
Hydrogen |
R&D |
ANU |
Active |
Solar Hydrogen Generation R&D Project |
$1,637,303 |
$818,652 |
ACT |
Exporting renewable energy |
Hydrogen |
R&D |
ANU |
Active |
Direct Water Electrolysis R&D Project |
$1,235,407 |
$1,042,703 |
ACT |
Other |
Hydrogen |
R&D |
ANU |
Active |
A Robotic Vision System for Automatic Inspection and Evaluation of Solar Plant Infrastructure |
$596,183 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Active |
Real-time Operational Distributed PV Simulations for Distribution Network Service Providers |
$1,198,359 |
$514,316 |
ACT |
Delivering secure and reliable electricity |
Solar PV |
R&D |
ANU |
Active |
Next Generation Industrial Bifacial Silicon Solar Cells |
$1,977,845 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Active |
Advanced Silicon Solar Cells by DESIJN (Deposited Silicon Junctions) |
$1,116,142 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Active |
Driving Increased Efficiency and Reliability in Silicon Photovoltaics - from ingots to modules |
$2,399,392 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Completed |
An Atlas of Pumped Hydro Energy Storage |
$609,000 |
$506,500 |
ACT |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
ANU |
Completed |
6-F001: Katherine Booker, Metal-assisted chemical etching of Sliver solar cells |
$356,749 |
$20,749 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Completed |
PV Modules for The Australian Environment (PV-MATE) |
$502,977 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
ANU |
Completed |
Eliminating material quality barriers to low cost, very high efficiency silicon solar cells and modules |
$2,023,407 |
$306,990 |
ACT |
Accelerating solar PV innovation |
Solar PV |
R&D |
Apace Research Ltd |
Active |
Ethtec Cellulosic Ethanol Pilot Plant |
$11,960,000 |
$0 |
NSW |
Improving energy productivity |
Bioenergy |
Demonstration |
Apricus Energy |
Terminated |
Intelligent energy storage for thermal comfort in solar powered homes |
$496,313 |
$0 |
VIC |
Improving energy productivity |
Solar PV |
Demonstration |
APT Pipelines Limited |
Active |
Emu Downs Solar Farm Project |
$5,500,000 |
$0 |
WA |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
APT Pipelines Limited |
Active |
Darling Downs Solar Farm |
$20,000,000 |
$0 |
QLD |
Accelerating solar PV innovation |
Large-scale solar |
Deployment |
ATCO Gas Australia Pty Ltd |
Active |
Jandakot Commercial Hybrid Energy H2 Microgrid (ATCO H2 Microgrid) |
$1,661,000 |
$1,130,810 |
WA |
Delivering secure and reliable electricity |
Hydrogen |
Demonstration |
Ausgrid |
Active |
Demand Management for Replacement Needs |
$1,000,000 |
$88,387 |
NSW |
Delivering secure and reliable electricity |
Demand Response (DR) |
Demonstration |
Australian Alliance for Energy Productivity (A2EP) |
Active |
Renewable energy for process heat, Australia-wide, Replacing non-renewable systems |
$447,000 |
$154,840 |
NSW |
Improving energy productivity |
Industrial heating and cooling |
Other Study |
Australian Association for Hydrogen Energy |
Active |
Australian Association of Hydrogen Energy (AAHE), International Energy Agency (IEA) Hydrogen Technology Collaboration Program (TCP), Promoting hydrogen implementation and utilization in Australia through International collaboration |
$494,000 |
$227,600 |
QLD |
Exporting renewable energy |
Hydrogen |
Other Study |
Australian Energy Market Operator Limited |
Active |
Virtual Power Plant Demonstrations |
$2,465,140 |
$0 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
Australian Energy Market Operator Limited |
Active |
National Energy Simulator Feasibility Study |
$500,000 |
$250,000 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Other Study |
Australian PV Institute |
Active |
Australian involvement in the IEA PV Power Systems, and solar heating and cooling implementing agreements |
$440,500 |
$0 |
NSW |
Other |
Solar PV |
Other Study |
Australian PV Institute |
Active |
International Energy Agency Technology Collaboration Programme - PV Power Systems |
$668,000 |
$162,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
Other Study |
Australian PV Institute |
Active |
International Energy Agency (IEA) Technology Collaboration Programme (TCP) - Solar Heating and Cooling |
$383,500 |
$93,700 |
NSW |
Improving energy productivity |
Solar Thermal |
Other Study |
Barcaldine Remote Community Solar Farm Pty Ltd |
Active |
Barcaldine 25MW Remote Community Solar Project |
$22,800,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Demonstration |
Bioenergy Australia |
Active |
Bioenergy Australia paricipation in the International Energy Agency (IEA) Technology Collaboration Programme (TCP) on Bioenergy |
$885,733 |
$265,711 |
NSW |
Exporting renewable energy |
Bioenergy |
Other Study |
Bioenergy Australia |
Completed |
Enhanced Australian Participation in IEA Bioenergy Tasks and Activities |
$707,667 |
$68,649 |
NSW |
Improving energy productivity |
Bioenergy |
Other Study |
BioPower Systems Pty Ltd |
Terminated |
bioWAVE Ocean Pilot at Port Fairy |
$11,541,864 |
$0 |
VIC |
Other |
Marine |
Demonstration |
BOC |
Active |
Renewable Hydrogen Production and Refuelling Project |
$950,000 |
$0 |
QLD |
Exporting renewable energy |
Hydrogen |
Demonstration |
Bundaberg Regional Irrigators Group Ltd |
Active |
Adapting Renewal Energy Concepts to Irrigated Sugarcane Production at Bundaberg |
$446,011 |
$101,200 |
QLD |
Improving energy productivity |
Enabling |
Demonstration |
Canadian Solar |
Active |
Longreach Solar Farm |
$1,300,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Canadian Solar |
Active |
Oakey Solar Farm |
$2,162,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Carnegie Wave Energy Limited |
Active |
The Albany Wave Energy Project |
$13,000,000 |
$0 |
WA |
Other |
Marine |
Demonstration |
Carnegie Wave Energy Limited |
Active |
Garden Island Microgrid Project |
$2,500,000 |
$0 |
WA |
Delivering secure and reliable electricity |
Marine |
Demonstration |
Carnegie Wave Energy Limited |
Completed |
The Perth Wave Energy Project (PWEP) |
$13,095,381 |
$0 |
WA |
Other |
Marine |
Demonstration |
Chargefox |
Active |
Electric Vehicle Charging Network Project |
$6,000,000 |
$2,000,000 |
VIC |
Improving energy productivity |
Enabling |
Demonstration |
Climate Council of Australia |
Active |
Climate Council Cities Power Partnership |
$493,150 |
$200,000 |
VIC |
Other |
Other |
Other Study |
Climate KIC Australia |
Active |
Residential heat pump study |
$500,000 |
$150,000 |
NSW |
Other |
Geothermal |
Other Study |
Climate KIC Australia |
Active |
Business Renewables Centre Australia |
$500,000 |
$75,000 |
NSW |
Improving energy productivity |
Market data and information |
Other Study |
CSIRO |
Active |
International Energy Agency (IEA) - SolarPACES (Solar Power and Chemical Energy Systems) Technology Collaboration Program (TCP) |
$394,000 |
$120,200 |
NSW |
Delivering secure and reliable electricity |
Solar Thermal |
Other Study |
CSIRO |
Active |
Feasibility study into dispatchable, cost effective power from forest and mill waste using the direct injection carbon engine (bioDICE) |
$432,000 |
$0 |
NSW |
Improving energy productivity |
Bioenergy |
Other Study |
CSIRO |
Active |
National Low-Voltage Feeder Taxonomy Study |
$485,025 |
$145,508 |
NSW |
Delivering secure and reliable electricity |
DER Integration |
Other Study |
CSIRO |
Active |
Australian Renewable Energy Mapping Infrastructure (AREMI) |
$2,197,150 |
$200,000 |
NSW |
Other |
Enabling |
Other Study |
CSIRO |
Active |
Missions Innovation Challenge - Smart Grids |
$113,750 |
$94,500 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Other Study |
CSIRO |
Active |
Missions Innovation Challenge - Affordable Heating and Cooling |
$37,000 |
$27,200 |
NSW |
Improving energy productivity |
Enabling |
Other Study |
CSIRO |
Active |
Methane Fuel Carrier R&D Project |
$1,085,553 |
$542,776 |
NSW |
Exporting renewable energy |
Hydrogen |
R&D |
CSIRO |
Active |
Hydrogen to Ammonia R&D Project |
$1,175,000 |
$587,500 |
VIC |
Other |
Hydrogen |
R&D |
CSIRO |
Active |
Liquid Fuel Carrier R&D Project |
$1,010,081 |
$505,011 |
VIC |
Other |
Hydrogen |
R&D |
CSIRO |
Active |
Solar Thermochemical Hydrogen R&D Project |
$2,007,676 |
$1,003,838 |
NSW |
Exporting renewable energy |
Hydrogen |
R&D |
CSIRO |
Active |
International Energy Agency (IEA) - Ocean Energy Systems -Technology Collaboration Program (TCP) |
$283,500 |
$0 |
TAS |
Other |
Marine |
Other Study |
CSIRO |
Active |
Specifying Guidelines for Assessing Perovskite Solar Cells |
$932,000 |
$312,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
Other Study |
CSIRO |
Active |
Manufacturing of Printed Perovskite PV Modules |
$3,310,248 |
$0 |
VIC |
Accelerating solar PV innovation |
Solar PV |
R&D |
CSIRO |
Active |
AIRAH PUSCH Australia - Promoting the Use of Solar Cooling and Heating in Australia |
$399,436 |
$69,436 |
NSW |
Improving energy productivity |
Solar Thermal |
Other Study |
CSIRO |
Active |
1-SRI002: CSIRO: Australian Solar Thermal Research Initiative (ASTRI) |
$35,208,747 |
$3,000,000 |
NSW |
Delivering secure and reliable electricity |
Solar Thermal |
R&D |
Curtin University |
Active |
White Gum Valley: Increasing the uptake of solar PV, using energy storage, monitoring and grid-connected micro-grids within strata |
$900,375 |
$97,000 |
WA |
Delivering secure and reliable electricity |
Enabling |
R&D |
DCP Company Pty Ltd |
Completed |
EJ004 Solar Rooftop Electricity Retailer |
$775,000 |
$75,000 |
VIC |
Other |
Solar PV |
Demonstration |
Degrussa Solar Project Pty Ltd |
Active |
DeGrussa Solar PV & Storage Project |
$20,900,000 |
$0 |
WA |
Improving energy productivity |
Solar PV |
Demonstration |
DNV GL |
Active |
Development of a Proposed Performance Standard for a Battery Storage System connected to a Domestic/Small Commercial Solar PV System |
$1,400,000 |
$700,000 |
VIC |
Delivering secure and reliable electricity |
Battery Storage |
Other Study |
DNV GL |
Active |
Multi-Model and Machine Learning Wind Forecast Project |
$270,941 |
$0 |
VIC |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Dynamic Limits |
Active |
DER Feasibility Study |
$292,213 |
$116,885 |
NSW |
Delivering secure and reliable electricity |
DER Integration |
Feasibility Study |
Dyno Nobel Moranbah Pty Ltd |
Active |
Expansion of Moranbah - Feasibility of Renewable Hydrogen |
$980,000 |
$0 |
QLD |
Exporting renewable energy |
Hydrogen |
Feasibility Study |
EDL Group Operations Pty Ltd |
Active |
Coober Pedy Renewable Diesel Hybrid |
$18,410,879 |
$549,234 |
SA |
Delivering secure and reliable electricity |
Hybrid |
Demonstration |
Electranet Pty Limited |
Active |
ElectraNet Energy Storage for Commercial Renewable Integration (ESCRI) Phase 2 (South Australia) - Deployment and Testing |
$12,000,000 |
$5,700,000 |
SA |
Delivering secure and reliable electricity |
Battery Storage |
Deployment |
Electricity Generation and Retail Corporation |
Active |
Alkimos Beach Energy Storage Project |
$3,310,000 |
$100,000 |
WA |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
Element 25 Limited |
Active |
Pilot studies for Intermittent Dynamic Electrowinning using renewable energy to produce high purity EMM and MnSO4 |
$490,000 |
$0 |
WA |
Exporting renewable energy |
Enabling |
Other Study |
EnergyAustralia |
Active |
Energy Australia Demand Response NSW |
$1,435,500 |
$167,475 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
EnergyAustralia |
Active |
Energy Australia Demand Response VIC and SA |
$6,929,000 |
$3,695,467 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
EnergyAustralia |
Active |
Phase 2 of EnergyAustralia South Australian Pumper Hydro Energy Storage Project |
$500,000 |
$0 |
SA |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
EnergyAustralia |
Completed |
South Australian Pumped Hydro Energy Storage (PHES) Feasibility Study |
$453,000 |
$0 |
SA |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other study |
EnerNOC Pty Ltd |
Active |
EnerNOC Demand Response NSW |
$1,800,000 |
$210,000 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
EnerNOC Pty Ltd |
Active |
EnerNOC Demand Response VIC |
$5,400,000 |
$630,000 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
EPC Technologies |
Active |
G.James Glass and Aluminium - a demonstration of medium-scale solar on industrial roof-tops can be effectively integrated into the distribution network |
$225,000 |
$150,000 |
QLD |
Delivering secure and reliable electricity |
Solar PV |
Other Study |
ERM Power |
Completed |
NSW Schools Energy Productivity Program (SEPP) |
$500,000 |
$500,000 |
NSW |
Improving energy productivity |
Solar PV |
Demonstration |
Evenergi Pty Ltd |
Active |
Charge Together Australia - Phase 2 |
$469,380 |
$117,345 |
NSW |
Improving energy productivity |
Enabling |
Deployment |
Evenergi Pty Ltd |
Completed |
South Australian Regional Electric Vehicle Adoption Program |
$172,215 |
$68,885 |
SA |
Improving energy productivity |
Enabling |
Demonstration |
Fast Cities |
Active |
Creating a National Ultrafast EV Charging Infrastructure Network |
$15,000,000 |
$0 |
QLD |
Improving energy productivity |
Enabling |
Demonstration |
Flow Power |
Active |
Flow Power Demand Response NSW |
$1,318,250 |
$153,796 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
Frontier Carbon Pty Ltd |
Completed |
Toolkit for Renewable Energy Financing |
$467,717 |
$173,880 |
VIC |
Other |
Enabling |
Other Study |
Fulcrum3D Pty Ltd |
Active |
CloudCAM Solar Forecasting for the NEM |
$490,800 |
$251,970 |
QLD |
Delivering secure and reliable electricity |
Other |
Deployment |
Fulcrum3D Pty Ltd |
Active |
Wind Forecasting for the NEM at Pacific Hydro's Clements Gap, Crowlands and Taralga Wind Farms |
$493,242 |
$177,129 |
NSW |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Genex |
Active |
Kidston Solar Project |
$8,850,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Genex |
Active |
Kidston Stage 2 Project |
$5,000,000 |
$2,476,805 |
QLD |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
Genex |
Completed |
Feasibility study to validate the construction of a large-scale pumped storage hydroelectric energy storage facility at a remote disused mine site in Northern Queensland |
$3,996,211 |
$471,312 |
QLD |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
Gess Devco Pty Ltd |
Active |
Gannawarra Energy Storage System (GESS) |
$22,735,000 |
$0 |
VIC |
Delivering secure and reliable electricity |
Battery Storage |
Demonstration |
Goldwind Australia Pty Ltd |
Active |
White Rock Solar Farm, co-located with White Rock Wind Farm |
$5,400,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Goldwind Australia Pty Ltd |
Active |
Field Study of Virtual Synchronous Generator at Gullen Range Wind Farm |
$400,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
System Security |
Demonstration |
Goldwind Australia Pty Ltd |
Active |
Demonstration of a high penetration renewable microgrid on an operating mine in WA |
$13,500,000 |
$0 |
WA |
Delivering secure and reliable electricity |
Off grid |
Deployment |
Greatcell Solar Limited |
Terminated |
Perovskite Solar Cell Technology - Large Area Module Development |
$6,000,000 |
$425,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
Demonstration |
GreenSync |
Active |
Decentralised Energy Exchange (deX) Program: scaling common platform requirements for decentralised energy exchanges across Australia |
$10,000,000 |
$1,951,073 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Deployment |
Gullen Solar Pty Ltd |
Active |
Gullen Range Solar Farm - co-located with Gullen Range Wind Farm |
$9,900,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Hivve |
Active |
HIVVE – Sustainable Modular Classrooms |
$334,650 |
$48,919 |
NSW |
Improving energy productivity |
Enabling |
Demonstration |
Horizon Power |
Active |
Horizon Power Business Model Pilot Project - Phase 1 (Highgarden) |
$1,920,000 |
$660,815 |
WA |
Delivering secure and reliable electricity |
Enabling |
Deployment |
HWF 2 Pty Ltd |
Completed |
Hornsdale Wind Farm Stage 2 (HWF2) FCAS Trial |
$271,709 |
$271,709 |
SA |
Delivering secure and reliable electricity |
Wind |
Demonstration |
Hydro Tasmania |
Active |
Participation in International Engagement Agency (IEA) Hydropower Technology Collaboration Program |
$280,000 |
$139,500 |
TAS |
Delivering secure and reliable electricity |
Enabling |
Other Study |
Hydro Tasmania |
Active |
Flinders Island Hybrid Energy Hub Project |
$5,500,000 |
$700,000 |
TAS |
Delivering secure and reliable electricity |
Hybrid |
Demonstration |
Hydro Tasmania |
Active |
Rottnest Island Renewable Energy Water Nexus Project |
$3,758,010 |
$0 |
WA |
Delivering secure and reliable electricity |
Hybrid |
Demonstration |
Hydro Tasmania |
Active |
Tasmanian Pumped-Hydro Energy Storage Opportunities Stage 2 |
$700,000 |
$0 |
TAS |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Feasibility Study |
Hydro Tasmania |
Active |
Hydro Tasmania: Repurposing the Tarraleah hydropower scheme for the future electricity market - Feasibility Study |
$2,500,000 |
$1,450,000 |
TAS |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
Hydrostor Australia Pty Ltd |
Active |
Advanced Compressed Air Energy Storage South Australia Project |
$6,000,000 |
$0 |
SA |
Delivering secure and reliable electricity |
Other |
Demonstration |
Indigenous Essential Services Pty Ltd |
Active |
Northern Territory Solar Energy Transformation Program (SETuP) |
$31,500,000 |
$9,000,000 |
NT |
Delivering secure and reliable electricity |
Hybrid |
Demonstration |
Indra Australia |
Active |
Indra Monash Smart Microgrid Project |
$2,974,162 |
$0 |
VIC |
Delivering secure and reliable electricity |
DER Integration |
Demonstration |
Industrial Monitoring & Control (IMC) |
Active |
Skycam and Multi-Model Solar Forecasting Project |
$1,247,841 |
$0 |
NSW |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Intercast & Forge Pty Ltd |
Active |
Intercast&Forge Demand Response SA |
$323,654 |
$37,760 |
SA |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
IT Power (Australia) Pty Limited |
Active |
Testing the performance of lithium-ion batteries |
$1,290,000 |
$44,500 |
ACT |
Delivering secure and reliable electricity |
Battery Storage |
R&D |
IT Power (Australia) Pty Limited |
Active |
Open Source Grid Integration Model for the National Electricity Market |
$624,940 |
$325,354 |
ACT |
Delivering secure and reliable electricity |
Enabling |
Other Study |
Jeanes Holland and Associates |
Completed |
A Roadmap for Concentrated Solar Thermal (CST) Power Generation in Australia |
$419,324 |
$126,046 |
TAS |
Delivering secure and reliable electricity |
Solar Thermal |
Other Study |
Jemalong JSS Project No 1 Pty Limited |
Active |
30MW Concentrating Solar Thermal power plant with thermal energy storage, Jemalong NSW |
$39,500,000 |
$1,240,000 |
NSW |
Delivering secure and reliable electricity |
Solar Thermal |
Demonstration |
Jemena Limited |
Active |
Demonstration projects of innovative grid-based power electronics technology applications to increase network DER hosting capacity and improve the quality of customer electricity supplies |
$1,124,985 |
$0 |
VIC |
Delivering secure and reliable electricity |
DER Integration |
Demonstration |
Jemena Limited |
Active |
Power to Gas Demonstration |
$5,710,000 |
$0 |
NSW |
Other |
Hydrogen |
Demonstration |
Karratha Solar Power No 1 Pty Ltd |
Completed |
Karratha Airport Solar Project |
$2,300,000 |
$0 |
WA |
Delivering secure and reliable electricity |
Large-scale solar |
Demonstration |
Kennedy Energy Park Pty Ltd |
Active |
Kennedy Energy Park (KEP) |
$18,000,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Hybrid |
Demonstration |
Laing O'Rourke Australia Pty Ltd |
Active |
SunSHIFT Pre-Commercial Deployment |
$2,100,396 |
$93,783 |
QLD |
Other |
Solar PV |
Deployment |
Lake Bonney BESS Pty Limited |
Active |
Lake Bonney BESS |
$5,000,000 |
$3,400,000 |
SA |
Delivering secure and reliable electricity |
Battery Storage |
Demonstration |
Lakeland Solar & Storage Pty Limited |
Active |
Lakeland Solar & Storage Project |
$17,419,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Demonstration |
LMS Energy Pty Ltd |
Active |
Pilot Landfill Solar PV Project |
$100,000 |
$0 |
VIC |
Accelerating solar PV innovation |
Solar PV |
Other Study |
LO3 Energy Pty Ltd |
Active |
Latrobe Valley Microgrid - Feasibility Assessment |
$370,000 |
$370,000 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Other Study |
Lord Howe Island Board |
Active |
Lord Howe Island Hybrid Renewable Project |
$4,500,000 |
$68,172 |
NSW |
Delivering secure and reliable electricity |
Hybrid |
Demonstration |
Macquarie Capital (Australia) Limited |
Active |
Kwinana Waste to Energy |
$23,000,000 |
$23,000,000 |
WA |
Improving energy productivity |
Bioenergy |
Deployment |
Macquarie University |
Active |
Biological Hydrogen Production R&D Project |
$1,148,455 |
$574,228 |
NSW |
Other |
Hydrogen |
R&D |
Manildra Solar Farm Pty Ltd |
Active |
Manildra Solar Farm |
$9,810,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Meridian Energy Australia |
Active |
Wind Forecasting Demonstration Project |
$2,180,155 |
$0 |
VIC |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Microbiogen Pty Ltd |
Active |
Microbiogen Biocatalyst Optimisation & Deployment Project for efficient production of biofuels |
$4,029,467 |
$1,425,725 |
NSW |
Improving energy productivity |
Bioenergy |
Demonstration |
Monash Energy Materials and System Institute (MEMSI) |
Active |
Participation in International Engagement Agency (IEA) Technology Collaboration Program (TCP) for Demand Side Management |
$500,500 |
$147,150 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Other Study |
Monash Energy Materials and System Institute (MEMSI) |
Active |
Water splitting electrodes R&D Project |
$1,054,209 |
$527,104 |
VIC |
Exporting renewable energy |
Hydrogen |
R&D |
Monash Energy Materials and System Institute (MEMSI) |
Active |
Ammonia production from renewables R&D Project |
$913,848 |
$457,924 |
VIC |
Exporting renewable energy |
Hydrogen |
R&D |
Monash Energy Materials and System Institute (MEMSI) |
Active |
Developing a New Type of High Efficiency Building Integrated PV Cell R&D Project |
$744,661 |
$0 |
VIC |
Accelerating solar PV innovation |
Solar PV |
R&D |
Monash Energy Materials and System Institute (MEMSI) |
Active |
Bringing All-Polymer Solar Cells Closer to Commercialization |
$840,000 |
$0 |
VIC |
Accelerating solar PV innovation |
Solar PV |
R&D |
Monash Energy Materials and System Institute (MEMSI) |
Completed |
From Plan to Action: Communicating pathways to deep decarbonisation through electric vehicles and renewable energy technologies |
$390,000 |
$0 |
VIC |
Other |
Enabling |
Other Study |
Moree Solar Farm Pty Ltd |
Completed |
Moree Solar Farm - Design, construction and build 56MWAC PV |
$101,700,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Mount Alexander Bioenergy Pty Ltd |
Completed |
Mt Alexander Waste to Energy Feasibility Study |
$146,468 |
$0 |
VIC |
Improving energy productivity |
Bioenergy |
Other Study |
MSM Milling |
Active |
MSM Milling Biomass Fuel Switch Project |
$2,000,000 |
$1,000,000 |
NSW |
Improving energy productivity |
Bioenergy |
Deployment |
Musselroe Wind Farm |
Active |
Musselroe Wind Farm FCAS Trial |
$499,120 |
$228,820 |
TAS |
Delivering secure and reliable electricity |
Wind |
Other Study |
Nectar Farms Management Pty Ltd |
Active |
High Efficiency Off Grid Glasshouse Project. |
$1,000,000 |
$349,708 |
VIC |
Improving energy productivity |
Enabling |
Feasibility Study |
Neoen Australia Pty Ltd |
Active |
Griffith Solar Farm |
$4,500,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Neoen Australia Pty Ltd |
Active |
Dubbo Solar Hub |
$4,950,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Neoen Australia Pty Ltd |
Active |
Parkes Solar Farm |
$6,750,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
NEV Power Pty Ltd |
Active |
Narara Ecovillage smart grid |
$1,158,660 |
$0 |
NSW |
Delivering secure and reliable electricity |
Hybrid |
Deployment |
NOJA Power Switchgear Pty Ltd |
Active |
NOJA Power Intelligent Switchgear Project |
$5,000,000 |
$1,768,908 |
QLD |
Other |
Enabling |
Demonstration |
Northern SEQ Distributor - Retailer Authority |
Active |
A feasibility study to undertake an assessment of the commercial viability of a waste to energy project at Unity Water's sewerage treatment plant |
$695,197 |
$111,239 |
QLD |
Improving energy productivity |
Bioenergy |
Other Study |
Oakley Greenwood Pty Ltd |
Active |
Pricing and Integration of Distributed Energy Resources Study |
$207,000 |
$82,800 |
QLD |
Delivering secure and reliable electricity |
DER Integration |
Other Study |
OneSteel Manufacturing Pty Limited |
Active |
Middleback Ranges Pumped Hydro Energy Storage Project Pre-feasibility Study |
$500,000 |
$500,000 |
SA |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
Origin Energy Eraring Pty Limited |
Active |
Shoalhaven Pumped Hydro Expansion Opportunity Feasibility Study |
$2,000,000 |
$1,000,000 |
NSW |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
PGWF Pty Ltd atf PGWF Unit Trust |
Active |
Fringe of Grid Battery Microgrid for Port Gregory (WA) Wind & Solar Farm |
$3,000,000 |
$0 |
WA |
Delivering secure and reliable electricity |
Battery Storage |
Demonstration |
Planet Innovation Pty Ltd |
Active |
ZenHQ Virtual Power Plant – delivering rapid distributed demand response and accelerating renewables integration through automated HVAC control |
$1,878,404 |
$201,248 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
Plumbing Industry Climate Action Centre (PICAC) |
Active |
PICAC Narre Warren - Net Zero Energy Facility |
$500,000 |
$475,000 |
VIC |
Improving energy productivity |
Geothermal |
Demonstration |
Pooled Energy Pty Ltd |
Active |
Pooled Energy Demand Management and Modulation |
$2,500,000 |
$300,000 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
Powercor Australia Pty Ltd |
Active |
DER Hosting Capacity Study |
$164,402 |
$65,761 |
VIC |
Delivering secure and reliable electricity |
DER Integration |
Other Study |
Powershop Australia |
Active |
Powershop Australia is developing a behavioural demand response program (Powershop DR Program) utilising a bespoke mobile app notification system directed to Victorian residential retail customers |
$1,113,269 |
$350,254 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
Proa Analytics Pty Ltd |
Active |
Solar Forecasts Project |
$728,072 |
$238,122 |
QLD |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Queensland University of Technology |
Active |
Hydrogen process R&D Project |
$3,350,000 |
$1,675,000 |
QLD |
Exporting renewable energy |
Hydrogen |
R&D |
Queensland University of Technology |
Active |
Integration of biogas from sugarcane residues in sugarcane transport and milling to reduce fossil fuel usage |
$2,239,100 |
$0 |
QLD |
Improving energy productivity |
Bioenergy |
R&D |
RACV |
Active |
Smart Hot Water System |
$272,998 |
$0 |
VIC |
Other |
DER Integration |
Demonstration |
RATCH - Australia Corporation Limited |
Active |
Collinsville Solar PV Power Station Stage 1 |
$9,500,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
RayGen |
Active |
RayGen PV Ultra Series B Equity Investment Opportunity |
$5,750,000 |
$850,000 |
VIC |
Accelerating solar PV innovation |
Solar PV |
Deployment |
Re.Group Pty Ltd |
Active |
Mt Piper Energy Recovery Project, Financial Investment Decision Study |
$1,000,000 |
$300,000 |
NSW |
Improving energy productivity |
Bioenergy |
Other Study |
Re.Group Pty Ltd |
Completed |
Feasibility Study into Mt Piper Hybrid W2E Project |
$400,000 |
$0 |
NSW |
Improving energy productivity |
Bioenergy |
Other Study |
Relectrify Pty Ltd |
Active |
BMS-Inverter Hybrid Project |
$338,000 |
$0 |
VIC |
Other |
Enabling |
Demonstration |
Renergi Pty Ltd |
Active |
A Low Emission Biofuel Technology |
$5,473,000 |
$773,000 |
WA |
Improving energy productivity |
Bioenergy |
Demonstration |
Renewable Developments Australia Pty Ltd |
Active |
Investment Case for the Pentland Integrated Biofuels Project |
$3,000,000 |
$0 |
QLD |
Improving energy productivity |
Bioenergy |
Other Study |
Restech Pty Limited |
Active |
The Enerverter (Project Aztec) |
$700,000 |
$100,000 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
RMIT University |
Active |
Melbourne Hydrogen Storage and Transport R&D Project |
$805,026 |
$402,513 |
VIC |
Exporting renewable energy |
Hydrogen |
R&D |
RMIT University |
Completed |
1-USOMUSIC: RMIT University: Micro-urban solar integrated concentrators (MUSIC) |
$4,921,191 |
$150,000 |
VIC |
Other |
Solar Thermal |
R&D |
Rural Industries Research & Development Corporation |
Active |
Australian Biomass for Bioenergy Assessment |
$3,160,669 |
$457,567 |
ACT |
Improving energy productivity |
Bioenergy |
Other Study |
Santos Limited |
Active |
Conversion of remote crude oil beam pumps to solar & battery project |
$4,200,000 |
$0 |
SA |
Delivering secure and reliable electricity |
Solar PV |
Demonstration |
SAPN |
Active |
Advanced VPP grid integration |
$1,032,000 |
$179,542 |
SA |
Delivering secure and reliable electricity |
DER Integration |
Demonstration |
Scouller Energy Pty Ltd |
Active |
Normanton Solar Farm |
$8,380,000 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Demonstration |
Sea Box International Pty Ltd |
Completed |
Sea Box Container Roll Out Warehousing System - Photovoltaic (CROWS-PV) |
$289,725 |
$0 |
ACT |
Accelerating solar PV innovation |
Solar PV |
Demonstration |
Simply Energy Solutions |
Active |
Simply Energy Virtual Power Plant (VPPX) Project |
$7,700,000 |
$1,939,355 |
SA |
Delivering secure and reliable electricity |
Solar PV |
Deployment |
SM Project Company Pty Ltd |
Completed |
Goulburn Bioenergy Project |
$2,100,000 |
$20,000 |
NSW |
Improving energy productivity |
Bioenergy |
Deployment |
Smart Storage (Ecoult) |
Active |
Project Fulfil |
$4,100,000 |
$512,500 |
NSW |
Delivering secure and reliable electricity |
Enabling |
R&D |
Snowy Hydro Limited |
Completed |
Snowy Hydro Limited's Project 2.0 Feasibility Study |
$8,000,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Pumped Hydro Energy Storage (PHES) |
Other Study |
Solar Analytics |
Active |
Enhanced Reliability through Short Time Resolution Data around Voltage Disturbances |
$491,725 |
$190,000 |
NSW |
Other |
DER Integration |
Demonstration |
Solar Analytics |
Active |
Accelerating the growth development of energy monitoring for solar households and small businesses |
$1,000,000 |
$1,000,000 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Deployment |
Solar Analytics |
Active |
Solar Monitoring for Better Energy Outcomes for Residential Solar PV |
$2,144,000 |
$200,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
Deployment |
Solar and Storage Modelling Pty Ltd |
Active |
Solcast nowcasting solutions for solar farms and the Australian energy sector |
$781,740 |
$154,769 |
NSW |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Solpod |
Active |
Solar PV Demonstration Project |
$975,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
Demonstration |
South Australian Govt DMITRE |
Terminated |
Solar Storage Diesel Hybrid System at Marree |
$3,180,000 |
$0 |
SA |
Delivering secure and reliable electricity |
Hybrid |
Demonstration |
Southern Cross REVC Trusco Pty Ltd |
Active |
Southern Cross Renewable Energy Fund |
$60,000,000 |
$1,096,153 |
NSW |
Other |
Enabling |
Demonstration |
Southern Oil Refining |
Active |
Commercialisation of renewable crude oil production from wastewater treatment plant waste |
$4,000,000 |
$250,000 |
QLD |
Improving energy productivity |
Bioenergy |
Demonstration |
Southern Oil Refining |
Active |
Project Rudolf (Measure) - Australian Biofuels from Australian Resources |
$3,188,630 |
$1,010,050 |
QLD |
Improving energy productivity |
Bioenergy |
Other Study |
Spotless Sustainability Services |
Active |
Ballarat Terminal Station Battery Energy Storage System (BESS) |
$2,265,000 |
$0 |
VIC |
Delivering secure and reliable electricity |
Battery Storage |
Demonstration |
Sustainable Melbourne Fund |
Active |
Expansion of the Environmental Upgrade Agreement (EUA) market in Victoria |
$821,369 |
$272,180 |
VIC |
Improving energy productivity |
Solar PV |
Other Study |
Swinburne University of Technology |
Completed |
Towards an Australian capability in arrays of ocean wave-power machines |
$770,728 |
$0 |
VIC |
Other |
Marine |
Other Study |
TasNetworks |
Active |
Tasmanian and Victorian Second Bass Strait Interconnector Feasibility Study |
$10,000,000 |
$4,000,000 |
TAS |
Delivering secure and reliable electricity |
Other |
Other Study |
The Trustee for Lastek Unit Trust |
Active |
Measurement guidelines for multi-junction solar cells with perovskite layers, CSIRO PV Performance Laboratory |
$732,038 |
$150,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
Demonstration |
Toyota Motor Corporation Australia Ltd |
Active |
Toyota Ecopark Hydrogen Demonstration |
$3,076,000 |
$0 |
VIC |
Exporting renewable energy |
Hydrogen |
Demonstration |
United Energy Distribution Pty Ltd |
Active |
Peak Demand Reduction using Solar and Storage |
$450,000 |
$0 |
VIC |
Delivering secure and reliable electricity |
Battery Storage |
Demonstration |
United Energy Distribution Pty Ltd |
Active |
United Energy Dynamic Voltage Management Demand Response (Product 2) |
$5,762,000 |
$1,613,360 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
United Energy Distribution Pty Ltd |
Active |
Voltage-Controlled Frequency Regulation System |
$900,000 |
$0 |
VIC |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
University of Melbourne |
Active |
Advanced Planning of PV-Rich Distribution Networks Study |
$203,867 |
$61,160 |
VIC |
Delivering secure and reliable electricity |
DER Integration |
Other Study |
University of Melbourne |
Active |
Hydrogen Fuelled Reciprocating Engines R&D Project |
$2,594,747 |
$1,297,374 |
VIC |
Improving energy productivity |
Hydrogen |
R&D |
University of Queensland |
Active |
PV Penetration Project |
$1,190,000 |
$400,000 |
QLD |
Delivering secure and reliable electricity |
Enabling |
Other Study |
University of South Australia |
Active |
Maximising solar PV with phase change thermal energy storage |
$995,290 |
$379,765 |
SA |
Improving energy productivity |
Enabling |
R&D |
University of Tasmania |
Active |
Optimal DER Scheduling for Frequency Stability Study |
$527,582 |
$158,275 |
TAS |
Delivering secure and reliable electricity |
DER Integration |
Other Study |
University of Tasmania |
Active |
Tidal Energy in Australia – Assessing Resource and Feasibility to Australia’s Future Energy Mix |
$2,494,860 |
$615,885 |
TAS |
Delivering secure and reliable electricity |
Marine |
Other Study |
University of Technology Sydney |
Active |
Develop lithium-sulfur batteries for large-scale electrical energy storage |
$830,000 |
$180,000 |
NSW |
Delivering secure and reliable electricity |
Battery Storage |
R&D |
University of Technology Sydney |
Active |
Networks Renewed: Using innovative inverter and battery storage technologies to improve network power quality, reduce costs and support solar PV |
$1,599,340 |
$472,185 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Demonstration |
University of Technology Sydney |
Completed |
UTS ISF Renewable Energy and Load Management (REALM) Stage 1 - Study |
$293,578 |
$293,578 |
NSW |
Improving energy productivity |
Enabling |
Other Study |
University of Technology Sydney |
Completed |
Social Access Solar Gardens |
$239,930 |
$189,930 |
NSW |
Accelerating solar PV innovation |
Solar PV |
Other Study |
University of the Sunshine Coast |
Active |
Control and manage the moisture content of woody biomass to create certainty in the quality and supply for bioenergy |
$300,000 |
$240,000 |
QLD |
Improving energy productivity |
Bioenergy |
Other Study |
University of Western Australia |
Active |
Methanol from Syngas R&D Project |
$1,079,875 |
$539,938 |
WA |
Exporting renewable energy |
Hydrogen |
R&D |
University of Western Australia |
Active |
From single to multiple wave energy converters: Cost reduction through location and configuration optimisation |
$994,198 |
$170,000 |
WA |
Other |
Marine |
R&D |
University of Wollongong |
Active |
The Smart Sodium Storage System for Renewable Energy Storage |
$2,678,307 |
$734,562 |
NSW |
Delivering secure and reliable electricity |
Battery Storage |
R&D |
UNSW |
Active |
Addressing barriers to efficient renewable integration |
$982,000 |
$163,600 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Other Study |
UNSW |
Active |
Mission Innovation Challenge - Off-Grid Access to Electricity |
$228,000 |
$0 |
NSW |
Delivering secure and reliable electricity |
Enabling |
Other Study |
UNSW |
Active |
Photovoltaic Electrolysis to Generate Hydrogen R&D Project |
$1,319,105 |
$659,552 |
NSW |
Exporting renewable energy |
Hydrogen |
R&D |
UNSW |
Active |
Waste Biomass to Renewable Hydrogen R&D Project |
$1,045,770 |
$522,885 |
NSW |
Improving energy productivity |
Hydrogen |
R&D |
UNSW |
Active |
1-A060:UNSW: Development and Commercialisation of High Efficiency Silicon Solar Cell Technology |
$6,472,980 |
$509,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
1-UFA002:UNSW: Multi-Junction c-Si Solar Cells Based on Virtual Ge Substrates |
$1,455,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
2-A002: UNSW, 40% Efficient Photovoltaic “Power Cube” Power Tower Receiver |
$1,400,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
1-SRI001: UNSW: Australia-US Institute for Advanced Photovoltaics (AUSIAPV) |
$64,999,005 |
$9,221,997 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
1-USO028:UNSW : Low-cost, high-efficiency Copper-Zinc-Tin-Sulphide (CZTS) on silicon multi-junction solar cells |
$2,612,358 |
$561,683 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Towards Ultimate Performance Commercial Silicon Solar Cells |
$2,970,702 |
$720,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
High-Efficiency Silicon/Perovskite Tandem Cells and Modules: Demonstration and Commercial Evaluation |
$3,599,459 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Accelerating industrial solar cells efficiency by development of plasma-enhanced chemical vapour deposition (PECVD) - based metal oxides |
$503,389 |
$150,000 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Metallised Encapsulant for Silicon PV Modules: A Path to Reduced LCOE for PV |
$1,160,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Improving World-Record Commercial High-Efficiency n-type Solar Cells through Recombination Analysis and Innovative Passivation |
$1,785,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Hydrogenated bifacial PERL Silicon PV Cells with laser doping and plated contacts R&D Project |
$1,100,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Hydrogenated and Hybrid Heterojunction p-type Silicon PV Cells R&&D Project |
$1,735,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Development of Beyond 20% Efficiency Kesterite (CZTSSe) Solar Cells: win the PV race with sustainable low-cost, low-toxic and stable materials |
$1,331,098 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Advanced high-efficiency silicon solar cells employing innovative atomic scale engineered surface and contact passivation layers |
$2,019,456 |
$605,837 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Next Generation Silicon sub-cells for high efficiency III-V/Si multi-junction solar cells |
$1,144,628 |
$228,926 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Integrating industrial black silicon with high efficiency multicrystalline solar cells |
$500,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Development of novel hydrogen trapping techniques for breakthrough Si casting and wafering technologies |
$1,968,000 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Efficient Adamantine Thin-Film on Silicon Tandem Cells: The Next Step in Commercial Cell Evolution |
$3,184,166 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Active |
Module Design for Lower Field Operating Temperature and Improved Yield |
$285,816 |
$0 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
UNSW |
Completed |
6-S011: UNSW, Adrian Shi, Copper-Zinc-Tin-Sulfide (CTZS) thin-film solar cell on stell for BIPV application |
$51,041 |
$4,148 |
NSW |
Accelerating solar PV innovation |
Solar PV |
R&D |
Vast Solar Pty Ltd |
Active |
Vast Solar 6MWth grid connected CSP research, development and demonstration facility with thermal energy storage |
$9,896,960 |
$0 |
NSW |
Delivering secure and reliable electricity |
Solar Thermal |
Demonstration |
Vestas Wind Systems A/S |
Active |
Wind Forecasting for the NEM Project |
$405,754 |
$89,658 |
SA |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
Voyages Indigenous Tourism |
Active |
Yulara 1.8MW Dispersed Solar PV Project |
$447,525 |
$97,525 |
NT |
Delivering secure and reliable electricity |
Solar PV |
Demonstration |
Wave Swell Energy Limited |
Active |
UniWave200 King Island Project |
$4,035,628 |
$0 |
TAS |
Delivering secure and reliable electricity |
Marine |
Demonstration |
Weipa Solar Farm Pty Ltd |
Terminated |
Weipa Solar PV Project |
$3,500,000 |
$0 |
QLD |
Improving energy productivity |
Solar PV |
Demonstration |
Whitsunday Solar Farm Pty Ltd |
Active |
Whitsunday Solar Farm |
$5,359,706 |
$0 |
QLD |
Delivering secure and reliable electricity |
Large-scale solar |
Deployment |
Windlab Limited |
Active |
LIDAR for Wind Forecast Projects |
$393,107 |
$340,607 |
QLD |
Delivering secure and reliable electricity |
Market data and information |
Demonstration |
WorleyParsons |
Completed |
Tidal Turbine Reef Feasibility Study |
$280,000 |
$0 |
WA |
Other |
Marine |
Other Study |
Zeppelin Bend Pty Ltd |
Active |
Publishing operating envelopes to the node to support the integration, orchestration and coordination of high-penetration DER in electricity distribution networks |
$4,292,632 |
$380,000 |
ACT |
Delivering secure and reliable electricity |
DER Integration |
Demonstration |
Zero Mass Water (Australia) Pty Ltd |
Active |
SOURCE Hydropanel Demonstration Project |
$420,000 |
$230,000 |
SA |
Accelerating solar PV innovation |
Solar PV |
Demonstration |
TOTAL: 254 |
$1,226,970,805 |
$127,534,491 |